Hestia & Hestia CT
Technical details
Specification text
The Henrad Hestia is a traditional bathroom radiator that retains the timeless character of the bathroom with its simplicity and symmetry of straight, round tubes. This radiator can also be used as a partition wall to create separate areas according to your personal taste. Also available with a centre connection.
Product
the classic bathroom radiator, also available with a centre connection
Also supplied
4 wall brackets, screws, plugs, air vent, blind plugs and installation instructions
Connections
4 x ½” female connection (6 x ½” if with centre connection)
Packaging
Every radiator is sturdily packaged in high-quality cardboard and wrapped in plastic. The radiator’s characteristics are shown on the label: type - height – length.
Warranty
10 years, as long as the installation instructions have been followed, Henrad’s warranty conditions have been met and the radiator is installed outside the splash area.
Paint process
All radiators are degreased, phosphated and powder-coated in Henrad white 9016 as standard.
Colour
Henrad white 9016
Max. operating pressure
10 bar (tested to 13 bar)
Max. operating temperature
95 °C
Conformity
in accordance with EN442
Quality assurance
NF 047
Heights
775 | 1.217 | 1.469 | 1.856 mm
Number of tubes
16 | 22 | 28 | 34
Lengths
500 | 600 | 750 mm
Tubes
horizontal, O-section, diameter of 22 mm
Collectors
vertical, D-section
Heat output & dimensions
Type overview
| 775 (mm) | 1217 (mm) | 1469 (mm) | 1856 (mm) | |
|---|---|---|---|---|
| Length: 500 mm | ||||
| W | 357 | 511 | 629 | 786 |
| kg | 5,8 | 8,3 | 10,4 | 12,8 |
| l | 3,6 | 5,2 | 6,5 | 8,0 |
| m² | 0,6 | 0,9 | 1,2 | 1,4 |
| n | 1,20 | 1,23 | 1,24 | 1,24 |
| Length: 600 mm | ||||
| W | 420 | 595 | 737 | 922 |
| kg | 6,6 | 9,6 | 11,9 | 14,6 |
| l | 4,1 | 5,9 | 7,4 | 9,1 |
| m² | 0,8 | 1,1 | 1,4 | 1,7 |
| n | 1,19 | 1,23 | 1,23 | 1,24 |
| Length: 750 mm | ||||
| W | 721 | 899 | 1.125 | |
| kg | 11,4 | 14,3 | 17,3 | |
| l | 7,0 | 8,7 | 10,7 | |
| m² | 1,3 | 1,6 | 2,0 | |
| n | 1,23 | 1,23 | 1,24 | |
Connections
Installation
Drill holes for the brackets
| RH | H1 | H2 |
| 775 | 94 | 680 |
| 1217 | 94 | 1110 |
| 1469 | 94 | 1365 |
| 1856 | 94 | 1770 |
Centre and wall distances
| RL | A | F | CW | FW |
| 500 | 455 | 350 | 75-85 | 90-100 |
| 600 | 555 | 450 | 75-85 | 90-100 |
| 750 | 705 | 600 | 75-85 | 90-100 |